LATEST NEWS

Altona optimises Turkey Creek

Monday, 10 August 2015Jack McGinn ALTONA Mining has added two years to the potential life of the Little Eva mine at its Cloncurry project in Queensland after undertaking a pit optimisation study on a recently discovered deposit. Drilling at Little …
Read more

Metal Bank rockets on copper hits

Andrew DuffyThursday, 30 July 2015 METAL Bank shares surged 88% this afternoon after the company posted broad copper intersections from the surface of its Mason Valley project in Nevada. The Bluestone project. Results from the first two holes of an …
Read more

Mineral Resource Statements

[1] Coalstoun Copper Deposit - Mineral Resource Statement and Disclaimer

Resource estimate figures for Coalstoun copper deposit, 0.3% Cu cut-off (minor rounding errors)

The Mineral Resources for the Coalstoun copper deposit was based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 JORC Code & Guidelines. Mr Tear is a director of H&S Consultants Pty Ltd and he consents to the inclusion of the estimates in the report of the Mineral Resource in the form and context in which they appear.

The information for the Coalstoun copper deposit that relates to exploration results is based on information compiled by Ms J. Hugenholtz, who is a Member of the Australian Institute of Geoscientists (MAIG). ­Ms Hugenholtz (Exploration Manager) is a full-time employee of ActivEX Limited and has sufficient experience relevant to the styles of mineralisation and types of deposit under consideration and the activities being undertaken to qualify as a Competent Person as defined by the 2012 Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Ms Hugenholtz consents to the inclusion in this report of the Mineral Resource in the form and context in which it appears.

[2] Barambah Gold-Silver Deposit - Mineral Resource Statement and Disclaimer
Resource estimate figures for Barambah gold-silver deposit, 0.5g/t Au cut-off (minor rounding errors)

The Mineral Resources for the Barambah gold-silver copper deposit was based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 JORC Code & Guidelines. Mr Tear is a director of H&S Consultants Pty Ltd and he consents to the inclusion of the estimates in the report of the Mineral Resource in the form and context in which they appear.

The information for the Barambah gold-silver deposit that relates to exploration results is based on information compiled by Ms J. Hugenholtz, who is a Member of the Australian Institute of Geoscientists (MAIG). ­Ms Hugenholtz (Exploration Manager) is a full-time employee of ActivEX Limited and has sufficient experience relevant to the styles of mineralisation and types of deposit under consideration and the activities being undertaken to qualify as a Competent Person as defined by the 2012 Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Ms Hugenholtz consents to the inclusion in this report of the Mineral Resource in the form and context in which it appears.

[3] Florence Bore North and South Copper Deposits - Mineral Resource Statement and Disclaimer

Resource estimate figures for Florence Bore North and South copper deposits, 0.5% Cu cut-off (minor rounding errors)

The Mineral Resources for the Florence Bore copper deposits were based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 JORC Code & Guidelines. Mr Tear is a director of H&S Consultants Pty Ltd and he consents to the inclusion of the estimates in the report of the Mineral Resource in the form and context in which they appear.

The information for the Florence Bore copper deposits that relates to exploration results is based on information compiled by Ms J. Hugenholtz, who is a Member of the Australian Institute of Geoscientists (MAIG). ­Ms Hugenholtz (Exploration Manager) is a full-time employee of ActivEX Limited and has sufficient experience relevant to the styles of mineralisation and types of deposit under consideration and the activities being undertaken to qualify as a Competent Person as defined by the 2012 Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2012). Ms Hugenholtz consents to the inclusion in this report of the Mineral Resource in the form and context in which it appears. 

[4] Lake Chandler Potash Deposit - Mineral Resource Statement and Disclaimer

Resource estimate figures for Lake Candler potash deposit (significant figures does not imply precision, no cut off grade used; default bulk density of 1.6t/m3)

The Mineral Resources for the Lake Chandler potash deposit was based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 JORC Code & Guidelines. Mr Tear is a director of H&S Consultants Pty Ltd and he consents to the inclusion of the estimates in the report of the Mineral Resource in the form and context in which they appear.

The information for the Lake Chandler potash deposit that relates to exploration results is based on information compiled by Ms J. Hugenholtz, who is a Member of the Australian Institute of Geoscientists (MAIG). ­Ms Hugenholtz (Exploration Manager) is a full-time employee of ActivEX Limited and has sufficient experience relevant to the styles of mineralisation and types of deposit under consideration and the activities being undertaken to qualify as a Competent Person as defined by the 2004 Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004). Ms Hugenholtz consents to the inclusion in this report of the Mineral Resource in the form and context in which it appears. 

This information for Lake Chandler was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.